Three stage generalized flowshop: Scheduling civil engineering projects
From MaRDI portal
Publication:2564880
DOI10.1007/BF00121677zbMath0866.90071OpenAlexW2055196005MaRDI QIDQ2564880
Moshe Dror, Paul A. Mullaseril
Publication date: 7 January 1997
Published in: Journal of Global Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf00121677
Related Items (2)
Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage ⋮ The hybrid flow shop scheduling problem
Cites Work
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- An Adaptable Scheduling Algorithm for Flexible Flow Lines
- The Complexity of Flowshop and Jobshop Scheduling
- A note on the influence of missing operations on scheduling problems
- One-Machine Sequencing to Minimize Certain Functions of Job Tardiness
- Unnamed Item
- Unnamed Item
This page was built for publication: Three stage generalized flowshop: Scheduling civil engineering projects