Iterative methods for manufacturing systems of two stations in tandem
From MaRDI portal
Publication:2565576
DOI10.1016/S0893-9659(97)00124-9zbMath1075.90518MaRDI QIDQ2565576
Publication date: 27 September 2005
Published in: Applied Mathematics Letters (Search for Journal in Brave)
90B30: Production models
Related Items
Sensitivity analysis of machine repair problems in manufacturing systems with service interruptions, Circulant approximation for preconditioning in stochastic automata networks, Markovian approximation for manufacturing systems of unreliable machines in tandem
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Circulant preconditioners for failure prone manufacturing systems
- Recent advances in control and optimization of manufacturing systems
- Optimal control of production rate in a failure prone manufacturing system
- Reversibility of Tandem Blocking Queueing Systems
- CGS, A Fast Lanczos-Type Solver for Nonsymmetric Linear systems
- Circulant Preconditioners for Markov-Modulated Poisson Processes and Their Applications to Manufacturing Systems