Sequencing and loading of products on a flowline
From MaRDI portal
Publication:2569078
DOI10.1016/J.EJOR.2004.07.036zbMath1083.90509OpenAlexW2022938367MaRDI QIDQ2569078
Michael P. Greco, Ezey M. Dar-El, Sarin, Subhash C.
Publication date: 17 October 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.07.036
Cites Work
- Unnamed Item
- Unnamed Item
- The interface of buffer design and cyclic scheduling decisions in deterministic flow lines
- Optimal two- and three-stage production schedules with setup times included
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- A Proof for the Queuing Formula: L = λW
- Games, Critical Paths and Assignment Problems in Permutation Flow Shops and Cyclic Scheduling Flow Line Environments
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
This page was built for publication: Sequencing and loading of products on a flowline