A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
From MaRDI portal
Publication:2571194
DOI10.1016/j.cor.2004.09.002zbMath1079.90045MaRDI QIDQ2571194
Ali Allahverdi, Fawaz S. Al-Anzi
Publication date: 1 November 2005
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2004.09.002
scheduling; tabu search; heuristic; distributed database system; maximum lateness; particle swarm optimization; assembly flowshop
90B40: Search theory
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop, A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times, A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines, A discrete particle swarm optimization for lot-streaming flowshop scheduling problem, Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan, The two-stage assembly scheduling problem to minimize total completion time with setup times, A new particle swarm optimization for the open shop scheduling problem, A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times, Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times, A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
Cites Work
- Unnamed Item
- Job lateness in a two-machine flowshop with setup times separated
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- Correctness of query execution strategies in distributed databases
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Scheduling alternative operations in two-machine flow-shops
- Minimizing Makespan in a Class of Reentrant Shops
- Optimal scheduling of the 3-machine assembly-type flow shop
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
- The three-stage assembly flowshop scheduling problem