Two machine preemptive scheduling problem with release dates, equal processing times and precedence constraints
From MaRDI portal
(Redirected from Publication:2576249)
Recommendations
- Preemptive scheduling of equal length jobs with release dates on two uniform parallel machines
- Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time
- Preemptive scheduling on uniform machines to minimize mean flow time
- scientific article; zbMATH DE number 3883931
- Preemptive scheduling of two uniform parallel machines to minimize total tardiness
Cites work
- A polynomial algorithm for \(P | p_j = 1,r_j, outtree\,| \sum C_j\)
- Algorithms for Edge Coloring Bipartite Graphs and Multigraphs
- Complexity results for single-machine problems with positive finish-start time-lags
- Open shop problems with unit time operations
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time
- Scheduling Open Shops with Unit Execution Times to Minimize Functions of Due Dates
Cited in
(12)- A survey on how the structure of precedence constraints may change the complexity class of scheduling problems
- Preemptive scheduling of equal length jobs with release dates on two uniform parallel machines
- Single machine due date assignment scheduling problem with precedence constraints and controllable processing times in fuzzy environment
- Ideal schedules in parallel machine settings
- On the optimality of the earliest due date rule in stochastic scheduling and in queueing
- A fast preemptive scheduling algorithm with release times and inclusive processing set restrictions
- The equivalence of two classical list scheduling algorithms for dependent typed tasks with release dates, due dates and precedence delays
- Scheduling three chains on two parallel machines
- Shortest path to nonpreemptive schedules of unit-time jobs on two identical parallel machines with minimum total completion time
- A multi-objective optimization for preemptive identical parallel machines scheduling problem
- Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
This page was built for publication: Two machine preemptive scheduling problem with release dates, equal processing times and precedence constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2576249)