Two machine preemptive scheduling problem with release dates, equal processing times and precedence constraints
From MaRDI portal
Publication:2576249
DOI10.1016/j.ejor.2004.08.037zbMath1091.90022MaRDI QIDQ2576249
Publication date: 27 December 2005
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.08.037
90C60: Abstract computational complexity for mathematical programming problems
90B35: Deterministic scheduling theory in operations research
Related Items
Scheduling three chains on two parallel machines, A multi-objective optimization for preemptive identical parallel machines scheduling problem, Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
Cites Work
- A polynomial algorithm for \(P | p_j = 1,r_j, outtree\,| \sum C_j\)
- Complexity results for single-machine problems with positive finish-start time-lags
- Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time
- Scheduling Open Shops with Unit Execution Times to Minimize Functions of Due Dates
- Algorithms for Edge Coloring Bipartite Graphs and Multigraphs
- Open shop problems with unit time operations
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey