Optimization of the lifetime of capital equipment using integral models
From MaRDI portal
Publication:2583315
Recommendations
Cited in
(13)- Hybrid approach to the rational management of machine replacement
- The optimal lifetime of capital equipment
- Fleet replacement under technological shocks
- A real options approach for joint overhaul and replacement strategies with mean reverting prices
- Analysis of generalized Glushkov integral models with controllable memory based on the V. K. Dzyadyk \(a\)-method
- Network economics and optimal replacement of age-structured IT capital
- Discrete-continuous analysis of optimal equipment replacement
- Numerical solution of the age structure optimization problem for basic types of power plants
- Residual Life Prediction and Optimal Maintenance Decision for a Piece of Equipment
- Operational asset replacement strategy: a real options approach
- Managing the exploitation life of the mining machinery for an unlimited duration of time
- The dynamics of asset lifetime under technological change
- Integral equation of optimal replacement: analysis and algorithms
This page was built for publication: Optimization of the lifetime of capital equipment using integral models
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2583315)