Minimising tool switching and indexing times by ant colony optimisation in automatic machining centres
From MaRDI portal
Publication:2627276
DOI10.1504/IJOR.2012.046228zbMath1362.90376OpenAlexW2052337614MaRDI QIDQ2627276
Reza Rastgordani, Maghsud Solimanpur
Publication date: 31 May 2017
Published in: International Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijor.2012.046228
job sequencingant colony optimisationACOtool positioningcutting toolsindexing timemachining centrestool switching time
Related Items
Unsupervised parallel machines scheduling with tool switches, A matheuristic for parallel machine scheduling with tool replacements