An FPTAS for the weighted number of tardy jobs minimization on a single machine with deteriorating jobs
From MaRDI portal
Publication:2628167
DOI10.3934/jimo.2016033zbMath1364.90168OpenAlexW2399328427MaRDI QIDQ2628167
Publication date: 12 June 2017
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2016033
Nonconvex programming, global optimization (90C26) Deterministic scheduling theory in operations research (90B35)
Related Items
Cites Work
- Unnamed Item
- Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs
- Scheduling with time-dependent execution times
- Time-dependent scheduling
- A fully polynomial approximation scheme for minimizing makespan of deteriorating jobs
- A concise survey of scheduling with time-dependent processing times
- Minimizing the total weighted completion time of deteriorating jobs
- A note on single-processor scheduling with time-dependent execution times
- Scheduling with time dependent processing times: Review and extensions
- Scheduling Deteriorating Jobs on a Single Processor
- NP-hard cases in scheduling deteriorating jobs on dedicated machines
- A Fully Polynomial Approximation Scheme for the Weighted Earliness–Tardiness Problem
- Scheduling
- Minimizing maximum lateness under linear deterioration