Freight railway operator timetabling and engine scheduling
From MaRDI portal
Publication:2629669
Recommendations
- An efficient MIP model for locomotive scheduling with time windows
- Engine scheduling by column generation
- On one approach to constructing timetables of freight trains in a railroad network
- Railway timetabling using Lagrangian relaxation
- Scheduled service network design for freight rail transportation
Cites work
- A column generation approach to train timetabling on a corridor
- A Primer in Column Generation
- A survey of optimization models for train routing and scheduling
- Accelerated label setting algorithms for the elementary resource constrained shortest path problem
- An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems
- Arc routing problems with time-dependent service costs
- Cost optimal periodic train scheduling
- Discrete-time dynamic traffic assignment models with periodic planning horizon: system optimum
- scientific article; zbMATH DE number 956787 (Why is no real title available?)
- Locomotive assignment with heterogeneous consists at CN North America
- New dynamic programming algorithms for the resource constrained elementary shortest path problem
- New route relaxation and pricing strategies for the vehicle routing problem
- Nominal and robust train timetabling problems
- Operations Research in passenger railway transportation
- Periodic railway timetabling with event flexibility
- Railway track allocation: Models and methods
- Shortest Path Problems with Resource Constraints
- The time-dependent prize-collecting arc routing problem
- The travelling salesman problem as a constrained shortest path problem: Theory and computational experience
- Vehicle Routing Problem with Time Windows
Cited in
(5)- Timetable rearrangement to cope with railway maintenance activities
- Engine scheduling by column generation
- Why does a railway infrastructure company need an optimized train path assignment for industrialized timetabling?
- An efficient MIP model for locomotive scheduling with time windows
- Rail schedule optimisation in the hunter valley coal chain
This page was built for publication: Freight railway operator timetabling and engine scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2629669)