Performance evaluation of due-date based dispatching rules in dynamic scheduling of diffusion furnace
From MaRDI portal
Publication:2656512
Recommendations
- Rule-based scheduling in wafer fabrication with due date-based objectives
- Dynamic state-dependent dispatching for wafer fabrication
- New dispatching rules for shop scheduling: A step forward
- Using dispatching rules for job shop scheduling with due date-based objectives
- Job scheduling of diffusion furnaces in semiconductor fabrication facilities
Cites work
- A Survey of Scheduling Rules
- A constraint programming approach for a batch processing problem with non-identical job sizes
- A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
- A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival
- Experimental evaluation of heuristic optimization algorithms: A tutorial
- Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
- Heuristic scheduling of jobs on a multi-product batch processing machine
- Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
- Makespan minimization in a no-wait flow shop problem with two batching machines
- Minimizing total weighted tardiness on a batch-processing machine with incompatible job families and job ready times
- Multiobjective scheduling of jobs with incompatible families on parallel batch machines
- New dispatching rules for shop scheduling: A step forward
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Rapid modeling and discovery of priority dispatching rules: An autonomous learning approach
- Scheduling and common due date assignment on a single parallel-batching machine with batch delivery
- Scheduling batch processing machines with incompatible job families
This page was built for publication: Performance evaluation of due-date based dispatching rules in dynamic scheduling of diffusion furnace
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2656512)