Single machine batch scheduling with non-increasing time slot costs
From MaRDI portal
Publication:2673533
DOI10.1007/s11590-021-01805-1zbMath1493.90068OpenAlexW3204611586MaRDI QIDQ2673533
Publication date: 10 June 2022
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-021-01805-1
Cites Work
- Unnamed Item
- Batch sizing and job sequencing on a single machine
- Scheduling with batching: Minimizing the weighted number of tardy jobs
- Batch scheduling to minimize maximum lateness
- On scheduling with non-increasing time slot cost to minimize total weighted completion time
- Scheduling with batching: A review
- Calibration scheduling with time slot cost
- Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing
- A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities
- A survey of scheduling problems with setup times or costs
- Minimizing flow-time on a single machine with integer batch sizes
- Optimal Algorithms and a PTAS for Cost-Aware Scheduling
- Scheduling Groups of Jobs on a Single Machine
- Scheduling with variable time slot costs
This page was built for publication: Single machine batch scheduling with non-increasing time slot costs