A discounted-cost continuous-time flexible manufacturing and operator scheduling model solved by deconvexification over time
From MaRDI portal
Publication:2805310
DOI10.1017/S0269964800003703zbMATH Open1335.90035OpenAlexW4256171294MaRDI QIDQ2805310FDOQ2805310
Authors: Uriel G. Rothblum, B. Curtis Eaves
Publication date: 11 May 2016
Published in: Probability in the Engineering and Informational Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1017/s0269964800003703
Recommendations
- A continuous-time average-cost flexible manufacturing and operator scheduling model solved by deconvexification over time
- A Discrete Time Average Cost Flexible Manufacturing and Operator Scheduling Model Solved by Deconvexification Over Time
- A maximum principle based combined method for scheduling in a flexible manufacturing system
- Optimal Flow Control for Continuous‐time Scheduling in Flexible Manufacturing Systems
- Generalized scheduling problem for discrete manufacture. I
Cites Work
- Title not available (Why is that?)
- An Algorithm for a Class of Continuous Linear Programs
- A continuous-time average-cost flexible manufacturing and operator scheduling model solved by deconvexification over time
- A Discrete Time Average Cost Flexible Manufacturing and Operator Scheduling Model Solved by Deconvexification Over Time
Cited In (2)
This page was built for publication: A discounted-cost continuous-time flexible manufacturing and operator scheduling model solved by deconvexification over time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2805310)