The fixed-charge shortest-path problem
From MaRDI portal
Publication:2815469
DOI10.1287/IJOC.1110.0469zbMATH Open1460.90055OpenAlexW2159339450MaRDI QIDQ2815469FDOQ2815469
Authors: Faramroze G. Engineer, G. L. Nemhauser, Martin W. P. Savelsbergh, Jin-Hwa Song
Publication date: 29 June 2016
Published in: INFORMS Journal on Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/ijoc.1110.0469
Recommendations
- An algorithm for the resource constrained shortest path problem
- scientific article; zbMATH DE number 1670670
- Solving resource constrained shortest path problems with LP-based methods
- New dynamic programming algorithms for the resource constrained elementary shortest path problem
- A penalty function heuristic for the resource constrained shortest path problem
Programming involving graphs or networks (90C35) Dynamic programming (90C39) Communication networks in operations research (90B18)
Cites Work
- The shortest-path problem with resource constraints and \(k\)-cycle elimination for \(k\geq 3\)
- An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems
- Shortest Path Problems with Resource Constraints
- A survey of results for sequencing problems with controllable processing times
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- Exact solution of bin-packing problems using column generation and branch-and-bound
- A Branch-and-Price Algorithm for the Generalized Assignment Problem
- Branch-and-price-and-cut for the split-delivery vehicle routing problem with time windows
- Title not available (Why is that?)
- Modelling path flows for a combined ship routing and inventory management problem
- Vehicle routing with split deliveries
- Decomposition of a combined inventory and time constrained ship routing problem
- Solving Parallel Machine Scheduling Problems by Column Generation
- Exact methods for the knapsack problem and its generalizations
- Solving binary cutting stock problems by column generation and branch- and-bound
- Parallel machine scheduling by column generation
- A Combined Vehicle Routing and Inventory Allocation Problem
- Scheduling with controllable release dates and processing times: Makespan minimization
- Technical Note—Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy
- Technical Note—The Multiperiod Knapsack Problem
Cited In (2)
This page was built for publication: The fixed-charge shortest-path problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2815469)