Two-stage stochastic mixed integer optimization models for power generation capacity expansion with risk measures
From MaRDI portal
Publication:2815507
DOI10.1080/10556788.2015.1076821zbMath1342.90120OpenAlexW2284187570MaRDI QIDQ2815507
Stefano Zigrino, Paolo Pisciella, Marida Bertocchi, Maria Teresa Vespucci
Publication date: 29 June 2016
Published in: Optimization Methods and Software (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/10556788.2015.1076821
uncertaintyrisk neutralpower generation capacity expansionrenewable energy sourcerisk averse strategiestwo-stagestochastic mixed integer optimization
Related Items (2)
The improved screening curve method regarding existing units ⋮ A risk-averse approach for the planning of a hybrid energy system with conventional hydropower
Cites Work
- A stochastic model for investments in different technologies for electricity production in the long period
- A note on second-order stochastic dominance constraints induced by mixed-integer linear recourse
- Decision making under uncertainty in electricity markets
- Risk aversion for an electricity retailer with second-order stochastic dominance constraints
- Conditional value-at-risk in stochastic programs with mixed-integer recourse
- Generation Capacity Expansion in a Risky Environment: A Stochastic Equilibrium Analysis
- Stochastic Programs with First-Order Dominance Constraints Induced by Mixed-Integer Linear Recourse
- Lectures on Stochastic Programming
- Risk Aversion via Excess Probabilities in Stochastic Programs with Mixed-Integer Recourse
- An enhanced model for portfolio choice with SSD criteria: a constructive approach
This page was built for publication: Two-stage stochastic mixed integer optimization models for power generation capacity expansion with risk measures