The effect of parameter estimation on the performance of one-sided Shewhart control charts for zero-inflated processes
DOI10.1080/03610926.2014.917188zbMath1348.60078OpenAlexW2344092367MaRDI QIDQ2816869
Philippe Castagliola, Athanasios C. Rakitzis
Publication date: 26 August 2016
Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610926.2014.917188
parameter estimationprobability generating functionmoment estimatoraverage run lengthzero-inflated Poisson distributionzero-inflated processeszero-inflated binomial distributionone-sided Shewhart control chartsstandard deviation run length
Point estimation (62F10) Applications of statistics in engineering and industry; control charts (62P30) Stochastic processes (60G99)
Related Items (4)
Cites Work
- Properties and performance of thec-chart for attributes data
- Attribute Charts for Zero-Inflated Processes
- The Effects of Sample Sizes in Phases I and II onpControl Chart Performance
- Univariate Discrete Distributions
- Run length distributions for estimated attributes charts
- Zero-inflated Poisson model in statistical process control.
This page was built for publication: The effect of parameter estimation on the performance of one-sided Shewhart control charts for zero-inflated processes