Online integrated production-distribution scheduling problems without preemption
From MaRDI portal
(Redirected from Publication:281801)
Recommendations
- On-line integrated production-distribution scheduling problems with capacitated deliveries
- On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
- On-line supply chain scheduling problems with preemption
- Integrated scheduling of production and distribution with release dates and capacitated deliveries
- Integrated Scheduling of Production and Distribution Operations
Cites work
- scientific article; zbMATH DE number 3471786 (Why is no real title available?)
- scientific article; zbMATH DE number 1232130 (Why is no real title available?)
- A Best Possible Deterministic On-Line Algorithm for Minimizing Maximum Delivery Time on a Single Machine
- A class of on-line scheduling algorithms to minimize total completion time
- Approximation algorithm for the on-line multi-customer two-level supply chain scheduling problem
- Batching and delivery in semi-online distribution systems
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Integrated Scheduling of Production and Distribution Operations
- Integrated production and delivery scheduling on a serial batch machine to minimize the makespan
- Integrated scheduling of production and delivery on a single machine with availability constraint
- On-line integrated production-distribution scheduling problems with capacitated deliveries
- On-line supply chain scheduling problems with preemption
- Optimal on-line algorithms for single-machine scheduling
- Restarts can help in the on-line minimization of the maximum delivery time on a single machine
- Semi-online two-level supply chain scheduling problems
- Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan
- Supply Chain Scheduling: Batching and Delivery
Cited in
(8)- Pre-auction lane selection in an integrated production–distribution planning problem
- On-line integrated production-distribution scheduling problems with capacitated deliveries
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms
- On-line supply chain scheduling problems with preemption
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines
- Approximation algorithm for the on-line multi-customer two-level supply chain scheduling problem
- On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
- scientific article; zbMATH DE number 5371399 (Why is no real title available?)
This page was built for publication: Online integrated production-distribution scheduling problems without preemption
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q281801)