An exact algorithm for an integrated project staffing problem with a homogeneous workforce
From MaRDI portal
(Redirected from Publication:282236)
Recommendations
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- An exact algorithm for minimizing resource availability costs in project scheduling
- A heuristic approach to project staffing
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
Cites work
- scientific article; zbMATH DE number 1462943 (Why is no real title available?)
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Column Generation Approach for Large-Scale Aircrew Rostering Problems
- A branch-and-bound algorithm for the resource-constrained project scheduling problem
- A branch-and-price approach for integrating nurse and surgery scheduling
- A generalized linear programming model for nurse scheduling
- A heuristic approach to project staffing
- A new approach to computing optimal schedules for the job-shop scheduling problem
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- A simulation and evaluation of earned value metrics to forecast the project duration
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Activity nets: A guided tour through some recent developments
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- An Algorithm for the Line Balancing Problem
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- An evaluation of the adequacy of project network generators with systematically sampled networks
- An exact algorithm for IP column generation
- An integer programming model for hierarchical workforce scheduling problem
- Audit scheduling with overlapping activities and sequence-dependent setup costs
- Branch and price for WDM optical networks with no bifurcation of flow
- Branch-and-price: Column generation for solving huge integer programs
- Branching in branch-and-price: A generic scheme
- Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem
- Efficient optimization of cyclic labor days-off scheduling
- Integer programming to schedule a hierarchical workforce with variable demands
- Measuring time. Improving project performance using earned value management
- Methods to solve multi-skill project scheduling problem
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Models and algorithms for a staff scheduling problem
- On Dantzig-Wolfe Decomposition in Integer Programming and ways to Perform Branching in a Branch-and-Price Algorithm
- On maximizing the net present value of a project under renewable resource constraints
- On project scheduling with irregular starting time costs
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling and staffing multiple projects with a multi-skilled workforce
- Scheduling of Project Networks by Job Assignment
- Scheduling projects with heterogeneous resources to meet time and quality objectives
- Scheduling trainees at a hospital department using a branch-and-price approach
- Single-shift off-day scheduling of a hierarchical workforce with variable demands
- Staff scheduling and rostering: a review of applications, methods and models.
- The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem
- The project scheduling problem with irregular starting time costs
- The resource renting problem subject to temporal constraints
- Time-constrained project scheduling
- Using mixed integer programming to design employee rosters
Cited in
(13)- Staffing a software project: A constraint satisfaction and optimization-based approach
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals
- The bilevel optimisation of a multi-agent project scheduling and staffing problem
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
- An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network
- A resource type analysis of the integrated project scheduling and personnel staffing problem
- A two-stage algorithm for a project scheduling problem with multi-skilled workforce constraints
- A heuristic approach to project staffing
- A graph-based formulation for the shift rostering problem
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
- On the complexity of assembly line balancing problems
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
This page was built for publication: An exact algorithm for an integrated project staffing problem with a homogeneous workforce
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q282236)