A note on longest processing time algorithms for the two uniform parallel machine makespan minimization problem
DOI10.1007/S10951-015-0453-XzbMATH Open1341.90054OpenAlexW2188096037MaRDI QIDQ282256FDOQ282256
Alex J. Ruiz-Torres, Giuseppe Paletta, Ivar Massabò
Publication date: 12 May 2016
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-015-0453-x
Recommendations
- A modified LPT algorithm for the two uniform parallel machine makespan minimization problem
- A Parametric Worst Case Analysis of the LPT Heuristic for Two Uniform Machines
- A heuristic for maximizing the number of on-time jobs on two uniform parallel machines
- A note on posterior tight worst-case bounds for longest processing time schedules
- An LPT-bound for a parallel multiprocessor scheduling problem
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Bounds for Certain Multiprocessing Anomalies
- Bounds on Multiprocessing Timing Anomalies
- Tighter bound for MULTIFIT scheduling on uniform processors
- Parametric bounds for LPT scheduling on uniform processors
- A note on MULTIFIT scheduling for uniform machines
- A note on the Coffman-Sethi bound for LPT scheduling
- A modified LPT algorithm for the two uniform parallel machine makespan minimization problem
- Scheduling Independent Tasks on Uniform Processors
- Bounds for Multifit Scheduling on Uniform Processors
- Tighter Bounds for LPT Scheduling on Uniform Processors
- Title not available (Why is that?)
- Title not available (Why is that?)
- Bounds for LPT Schedules on Uniform Processors
- An Application of Bin-Packing to Multiprocessor Scheduling
- A Parametric Worst Case Analysis of the LPT Heuristic for Two Uniform Machines
- A note on LPT scheduling
Cited In (4)
- An approximation algorithm for multi-agent scheduling on two uniform parallel machines
- The LPT heuristic for minimizing total load on a proportionate openshop
- Makespan minimization on uniform parallel machines with release times
- A note on posterior tight worst-case bounds for longest processing time schedules
This page was built for publication: A note on longest processing time algorithms for the two uniform parallel machine makespan minimization problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q282256)