Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines
From MaRDI portal
Publication:2825621
DOI10.7494/dmms.2013.7.1.43zbMath1351.90011OpenAlexW2117558077MaRDI QIDQ2825621
Publication date: 13 October 2016
Published in: Decision Making in Manufacturing and Services (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.7494/dmms.2013.7.1.43
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items