Human resources scheduling to improve the product quality according to exhaustion limit
From MaRDI portal
Publication:287639
DOI10.1007/S11750-013-0310-ZzbMATH Open1336.90030OpenAlexW2016265592MaRDI QIDQ287639FDOQ287639
Authors: Mir Mehdi Seyyed Esfahani, Rad M. Jamshidi
Publication date: 23 May 2016
Published in: Top (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11750-013-0310-z
Recommendations
- Scheduling models for optimizing human performance and well-being
- Scheduling of unrelated parallel manufacturing cells with limited human resources
- Human resource management using working time accounts with expiry of hours
- A variable neighborhood search algorithm for human resource selection and optimization problem in the home appliance manufacturing industry
- Publication:3489772
Cites Work
- Handbook of metaheuristics
- A hybrid Taguchi-immune approach to optimize an integrated supply chain design problem with multiple shipping
- A generalized group maintenance policy
- Single-machine scheduling with periodic maintenance and nonresumable jobs.
- Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
- Single-machine scheduling with periodic maintenance to minimize makespan
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
Cited In (2)
This page was built for publication: Human resources scheduling to improve the product quality according to exhaustion limit
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q287639)