Parallel-machine scheduling with delivery times and deteriorating maintenance
From MaRDI portal
Publication:2948896
zbMATH Open1325.90031MaRDI QIDQ2948896FDOQ2948896
Authors:
Publication date: 6 October 2015
Recommendations
- Parallel-machine scheduling problems with past-sequence-dependent delivery times and aging maintenance
- Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties
- Scheduling position-based deteriorating jobs with multiple rate-modifying activities and past-sequence-dependent delivery times
- Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
- Scheduling with simple deterioration and past-sequence-dependent delivery times
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35)
Cited In (13)
- Production, maintenance and resource scheduling: a review
- Dynamic dispatching and preventive maintenance for parallel machines with dispatching-dependent deterioration
- Scheduling with deterioration effects and maintenance activities under parallel processors
- Parallel machine scheduling with a deteriorating maintenance activity and total absolute differences penalties
- Scheduling a maintenance activity on parallel identical machines
- Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration
- A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities
- Parallel-machine scheduling with maintenance: praising the assignment problem
- Scheduling position-based deteriorating jobs with multiple rate-modifying activities and past-sequence-dependent delivery times
- Unrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion time
- Parallel-machine scheduling problems with past-sequence-dependent delivery times and aging maintenance
- Unrelated parallel-machine scheduling with controllable processing times and impact of deteriorating maintenance activities under consideration
- Machine scheduling with a maintenance interval and job delivery coordination
This page was built for publication: Parallel-machine scheduling with delivery times and deteriorating maintenance
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2948896)