An integrated approach for earthwork allocation, sequencing and routing
From MaRDI portal
(Redirected from Publication:296873)
Recommendations
- Solving the shortest route cut and fill problem using simulated annealing
- A two-stage optimizing method for earth-rock allocation based on improved VIKOR
- Spline technique for modeling roadway profile to minimize earthwork cost
- Dynamic optimization algorithm for vertical alignment of highways
- Optimum ramp design in open pit mines
Cites work
- A classification of formulations for the (time-dependent) traveling salesman problem
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- A mathematical programming viewpoint for solving the ultimate pit problem
- A sequencing approach for creating new train timetables
- A sliding time window heuristic for open pit mine block sequencing
- An application of branch and cut to open pit mine scheduling
- Fast shortest-paths algorithms in the presence of few destinations of negative-weight arcs
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- Models and algorithms to improve earthwork operations in road design using mixed integer linear programming
- Network flows. Theory, algorithms, and applications.
- Solving LP relaxations of large-scale precedence constrained problems
- Solving the shortest route cut and fill problem using simulated annealing
- Tabu search embedded simulated annealing for the shortest route cut and fill problem
- The Time-Dependent Traveling Salesman Problem and Its Application to the Tardiness Problem in One-Machine Scheduling
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- The time dependent traveling salesman problem: polyhedra and algorithm
Cited in
(10)- Stockpile scheduling with geometry constraints in dry bulk terminals
- A two-stage optimizing method for earth-rock allocation based on improved VIKOR
- A mixed-integer linear programming model to optimize the vertical alignment considering blocks and side-slopes in road construction
- scientific article; zbMATH DE number 2006562 (Why is no real title available?)
- A generalized constructive algorithm using insertion-based heuristics
- scientific article; zbMATH DE number 2006563 (Why is no real title available?)
- Multi-objective models and techniques for analysing the absolute capacity of railway networks
- Optimisation models for expanding a railway's theoretical capacity
- A flexible job shop scheduling approach with operators for coal export terminals
- Optimizing horizontal alignment of roads in a specified corridor
This page was built for publication: An integrated approach for earthwork allocation, sequencing and routing