An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
DOI10.1016/J.EJOR.2013.08.021zbMATH Open1339.90143OpenAlexW2060331334MaRDI QIDQ296973FDOQ296973
Tommy Messelis, Patrick De Causmaecker
Publication date: 24 June 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/410075
Recommendations
- An improved ant algorithm for multi-mode resource constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
combinatorial optimisationdecision support systemsalgorithm portfolioproject schedulingautomatic algorithm selectionperformance prediction
Convex programming (90C25) Management decision making, including multiple objectives (90B50) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
Cites Work
- PSPLIB -- a project scheduling problem library
- Paramils: an automatic algorithm configuration framework
- Self-organized formation of topologically correct feature maps
- On the measurement of complexity in activity networks
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A survey of variants and extensions of the resource-constrained project scheduling problem
- SATzilla: portfolio-based algorithm selection for SAT
- Scheduling subject to resource constraints: Classification and complexity
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Phase transitions in project scheduling
- A self-adapting genetic algorithm for project scheduling under resource constraints
- Principles and Practice of Constraint Programming – CP 2004
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- On the use of the complexity index as a measure of complexity in activity networks
- Measuring instance difficulty for combinatorial optimization problems
- Formulation and tabu search algorithm for the resource constrained project scheduling problem.
- On Dynamic Programming Methods for Assembly Line Balancing
- Optimal Reduction of Two-Terminal Directed Acyclic Graphs
- Project scheduling: The effects of problem structure on heuristic performance
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Case-based reasoning and improved adaptive search for project scheduling
- Adaptive search for solving hard project scheduling problems
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
Cited In (13)
- On the summary measures for the resource-constrained project scheduling problem
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
- Machine learning at the service of meta-heuristics for solving combinatorial optimization problems: a state-of-the-art
- Optimizing resource-constrained project scheduling problem considering the reliability function
- An algorithm selection approach for the flexible job shop scheduling problem: choosing constraint programming solvers through machine learning
- A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment
Uses Software
This page was built for publication: An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q296973)