Transmission Network Expansion Planning Under Deliberate Outages
From MaRDI portal
Publication:2974337
DOI10.1007/978-3-642-02493-1_16zbMATH Open1359.90013OpenAlexW2111462067MaRDI QIDQ2974337FDOQ2974337
Authors: Natalia Alguacil, José M. Arroyo, Miguel Carrión
Publication date: 7 April 2017
Published in: Energy Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-02493-1_16
Recommendations
- Long-term and Expansion Planning for Electrical Networks Considering Uncertainties
- Transmission capacity expansion planning with economic dispatching and flow evaluation
- Communication-Constrained Expansion Planning for Resilient Distribution Systems
- A reactive grasp for transmission network expansion planning
- Power transmission network expansion planning: a semidefinite programming branch-and-bound approach
- Transmission network expansion planning considering phase-shifter transformers
- Multiobjective transmission expansion planning considering security and demand uncertainty
riskscenariovulnerabilitymixed-integer linear programmingtransmission network expansion planningdeliberate outagesminimax weighted regret
Cites Work
Cited In (9)
- Transmission Network Expansion Planning Under Deliberate Outages
- A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines
- Climate-aware generation and transmission expansion planning: a three-stage robust optimization approach
- A two-stage resource allocation model for lifeline systems quick response with vulnerability analysis
- Optimizing designs and operations of a single network or multiple interdependent infrastructures under stochastic arc disruption
- A trilevel programming approach for electric grid defense planning
- Long-term and Expansion Planning for Electrical Networks Considering Uncertainties
- Communication-Constrained Expansion Planning for Resilient Distribution Systems
- Transmission capacity expansion planning with economic dispatching and flow evaluation
Uses Software
This page was built for publication: Transmission Network Expansion Planning Under Deliberate Outages
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2974337)