Multi-stage man-machine cooperated scheduling method for dynamic flexible job shop scheduling problem
From MaRDI portal
Publication:2994089
DOI10.13195/J.KZYJC.2014.1214zbMATH Open1349.90428MaRDI QIDQ2994089FDOQ2994089
Authors: Guo-Hui Zhang, Yongcheng Wang, Haijun Zhang
Publication date: 10 August 2016
Recommendations
- Dynamic flexible job shop scheduling problem based on variant rescheduling interval strategy
- Dynamic job shop scheduling using variable neighbourhood search
- Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
- An improved hybrid metaheuristics and rule-based approach for flexible job-shop scheduling subject to machine breakdowns
- A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms
Cited In (1)
This page was built for publication: Multi-stage man-machine cooperated scheduling method for dynamic flexible job shop scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2994089)