Remanufacturing production planning with compensation function approximation method
DOI10.1016/J.AMC.2015.01.070zbMATH Open1338.90241OpenAlexW1999565523WikidataQ126032112 ScholiaQ126032112MaRDI QIDQ299716FDOQ299716
Authors: Haijun Wen, Mingzhou Liu, Changyi Liu, Conghu Liu
Publication date: 22 June 2016
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2015.01.070
Recommendations
- A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system
- An optimization algorithm for integrated remanufacturing production planning and scheduling system
- Capacitated dynamic production and remanufacturing planning under demand and return uncertainty
- Optimizing remanufacturing production decisions for the remanufacturer
- Cost optimization in product remanufacturing considering insufficient recovery capacity and quality uncertainty
approximation methodproduction planningremanufacturinghybrid intelligent algorithmtwo-stage uncertain programming
Cites Work
Cited In (6)
- Tax or subsidy? Design and selection of regulatory policies for remanufacturing
- Multi-objective optimization method of remanufacturing processing workshop scheduling under uncertain conditions
- Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution
- An optimization algorithm for integrated remanufacturing production planning and scheduling system
- How points-exchange incentives in a closed-loop supply chain weaken competition from the informal recycler
- The CVaR convex approximation and SAA method for optimal re-manufacturing production planning
This page was built for publication: Remanufacturing production planning with compensation function approximation method
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q299716)