An analytical model for service level and tardiness in a single machine MTO production system
From MaRDI portal
Publication:2997887
DOI10.1080/00207541003660176zbMath1211.90066OpenAlexW2100179934MaRDI QIDQ2997887
Klaus Altendorfer, Herbert Jodlbauer
Publication date: 10 May 2011
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207541003660176
Related Items (5)
Pooling heterogeneous products for manufacturing environments ⋮ A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour ⋮ Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a make-to-order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm ⋮ Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates ⋮ Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
Cites Work
- Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies
- Trade-off between capacity invested and inventory needed
- Optimal Lead Time Policies
- A time-continuous analytic production model for service level, work in process, lead time and utilization
- Probabilistic Service Level Guarantees in Make-to-Stock Manufacturing Systems
- Lot Sizes, Lead Times and In-Process Inventories
- A Proof for the Queuing Formula: L = λW
- Quoting Customer Lead Times
- Throughput, flow times, and service level in an unreliable assembly system
- Unnamed Item
This page was built for publication: An analytical model for service level and tardiness in a single machine MTO production system