Bicriteria scheduling with vacations on a single machine
From MaRDI portal
Publication:2997965
DOI10.1080/02522667.2008.10699819zbMATH Open1211.90097OpenAlexW2317388378MaRDI QIDQ2997965FDOQ2997965
Authors: Wen-Jinn Chen
Publication date: 10 May 2011
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: http://www.connectjournals.com/file_html_pdf/56603H_jios268_531-542_abs.htm
Recommendations
Cites Work
- Multicriteria scheduling
- Title not available (Why is that?)
- Solving a bicriterion scheduling problem
- A dual algorithm for the one-machine scheduling problem
- A note on the extension of a result on scheduling with secondary criteria
- Note: Bicriteria scheduling for minimizing flow time and maximum tardiness
- Sequencing with setup time and order tardiness trade-offs
- A single-machine problem with multiple criteria
Cited In (1)
This page was built for publication: Bicriteria scheduling with vacations on a single machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2997965)