Integrated Sequencing and Scheduling in Coil Coating
From MaRDI portal
Publication:3005704
DOI10.1287/mnsc.1100.1302zbMath1214.90042OpenAlexW2119452138MaRDI QIDQ3005704
Marco E. Lübbecke, Felix G. König, Wiebke Höhn, Rolf H. Möhring
Publication date: 9 June 2011
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/a1cdebb2bb76a5c6110ffb8d4a0fb8f8da46de60
schedulingsequencingindependent setbranch-and-price2-union graphscoil coatingintegrated steel production
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items
Integrated Charge Batching and Casting Width Selection at Baosteel, Interval scheduling and colorful independent sets, Integrated optimization of material supplying, manufacturing, and product distribution: models and fast algorithms, Sequencing and scheduling for filling lines in dairy production, Inductive \(k\)-independent graphs and \(c\)-colorable subgraphs in scheduling: a review
Uses Software