Location and lead-time perturbations in multi-level assembly systems of perishable goods in Spanish baby food logistics
From MaRDI portal
Publication:301939
DOI10.1007/s10100-014-0372-5zbMath1339.90217OpenAlexW1982105833MaRDI QIDQ301939
Danijel Kovačić, Eloy Hontoria, Marija Bogataj, Lorenzo Ros-McDonnell
Publication date: 4 July 2016
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-014-0372-5
Transportation, logistics and supply chain management (90B06) Case-oriented studies in operations research (90B90)
Related Items (6)
An optimisation approach for the e-grocery order picking and delivery problem ⋮ On approximating the accelerator part in dynamic input-output models ⋮ Optimizing logistics routings in a network perspective of supply and demand nodes ⋮ Editorial ⋮ Methodologies and applications for resilient global development from the aspect of SDI-SOR special issues of CJOR ⋮ Or in the industrial engineering of industry 4.0: experiences from the Iberian Peninsula mirrored in CJOR
Cites Work
This page was built for publication: Location and lead-time perturbations in multi-level assembly systems of perishable goods in Spanish baby food logistics