Integrated workforce capacity and inventory management under labour supply uncertainty
From MaRDI portal
Publication:3055366
DOI10.1080/00207540801930237zbMATH Open1198.90039OpenAlexW2046338449MaRDI QIDQ3055366FDOQ3055366
M. Fazil Pac, Osman Alp, Tarkan Tan
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/22866
Cites Work
- A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand
- Lot Sizing with Random Yields: A Review
- A Periodic Review, Production Planning Model with Uncertain Capacity and Uncertain Demand—Optimality of Extended Myopic Policies
- A Production-Inventory System with Markovian Capacity and Outsourcing Option
- Production and subcontracting strategies for manufacturers with limited capacity and volatile demand
- Contingent Labor Contracting Under Demand and Supply Uncertainty
- Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand
- Capacity Acquisition, Subcontracting, and Lot Sizing
- Capacity and production management in a single product manufacturing system
Cited In (9)
- The effect of labour costs, holding costs, and uncertainty in demand on pull inventory control policies
- Two-stage workforce planning under demand fluctuations and uncertainty
- Integrated capacity and inventory management with capacity acquisition lead times
- Managing Supply in the On-Demand Economy: Flexible Workers, Full-Time Employees, or Both?
- Joint management of capacity and inventory in make-to-stock production systems with multi-class demand
- A real options approach to labour shifts planning under different service level targets
- Operations risk management by optimally planning the qualified workforce capacity
- Capacity reservation and utilization for a manufacturer with uncertain capacity and demand
- A capacity constrained production-inventory system with stochastic demand and production times
This page was built for publication: Integrated workforce capacity and inventory management under labour supply uncertainty
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3055366)