Optimising material handling costs in an assembly workshop
From MaRDI portal
Publication:3055375
Recommendations
- Effective material flow at an assembly facility
- Optimization of workcell layouts in a mixed-model assembly line environment
- Research on material distribution of hydraulic components in digital workshop
- The control of a conveyor under the economical aspect
- Evaluating lean execution performance in Indian MSMEs using SEM and TOPSIS models
Cites work
- A note on two problems in connexion with graphs
- Dynamic shortest paths minimizing travel times and costs
- Modeling Vehicular Traffic Flow using M/G/C/C State Dependent Queueing Models
- Modeling and Analysis of Congestion in the Design of Facility Layouts
- Quadratic assignment problems and \(M/G/C/C/\) state dependent network flows
Cited in
(6)- A simulation study of despatch bay performance in the steel processing industry
- Optimization of workcell layouts in a mixed-model assembly line environment
- Solution of a Facility Layout Problem in a Final Assembly Workshop using Constraint Programming
- Warehouse processes improvement using lean six sigma and RFID technology
- Research on material distribution of hydraulic components in digital workshop
- Effective material flow at an assembly facility
This page was built for publication: Optimising material handling costs in an assembly workshop
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3055375)