Kanban-based pull systems with advance demand information
From MaRDI portal
Publication:3055420
DOI10.1080/00207540701739589zbMath1198.90032OpenAlexW2081946946MaRDI QIDQ3055420
David Claudio, Ananth Krishnamurthy
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701739589
Related Items (2)
The repair kit problem with imperfect advance demand information ⋮ Optimal control policies for an inventory system with commitment lead time
Cites Work
- Performance analysis of single stage kanban controlled production systems using parametric decomposition
- The value of advance demand information in production/inventory systems
- Comparison among three pull control policies: Kanban, base stock, and generalized kanban
- A unified framework for pull control mechanisms in multi-stage manufacturing systems
- Re-examining the performance of MRP and kanban material control strategies for multi-product flexible manufacturing systems
- Analysis of a Forecasting-Production-Inventory System with Stationary Demand
- Integrating Replenishment Decisions with Advance Demand Information
- Analysis of production control systems kanban and CONWIP
- A comparison of production-line control mechanisms
- An overview of design and operational issues of kanban systems
- Comparative modelling of multi-stage production-inventory control policies with lot sizing
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems
- On the value of information in dynamic production/inventory problems under forecast evolution
- Customer-Order Information, Leadtimes, and Inventories
This page was built for publication: Kanban-based pull systems with advance demand information