Sequential quadratic programming and analytic hierarchy process for nonlinear multiobjective optimization of a hydropower network
From MaRDI portal
Publication:3057014
DOI10.1002/oca.909zbMath1200.90082MaRDI QIDQ3057014
Ali Ghaffari, S. Ali A. Moosavian, Amir Salimi
Publication date: 24 November 2010
Published in: Optimal Control Applications and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/oca.909
multicriteria decision analysis; sequential quadratic programming; multiobjective optimization; analytical hierarchy process; stochastic-weighted sum method
90C29: Multi-objective and goal programming
90B35: Deterministic scheduling theory in operations research
90B10: Deterministic network models in operations research
90B90: Case-oriented studies in operations research
90C55: Methods of successive quadratic programming type
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Goal programming for decision making: An overview of the current state-of-the-art
- The influence of the fitness evaluation method on the performance of multiobjective search algorithms
- Optimal Estimation of Executive Compensation by Linear Programming
- Axiomatic Foundation of the Analytic Hierarchy Process
- Multiple-objective problems: Pareto-optimal solutions by method of proper equality constraints