Optimal solution structure for multi-period production planning with returned products remanufacturing
From MaRDI portal
Publication:3069764
DOI10.1142/S0217595910002910zbMATH Open1203.90060MaRDI QIDQ3069764FDOQ3069764
Jihong Zhang, Xiaoqiang Cai, Jian Chen, Yongjian Li
Publication date: 19 January 2011
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Recommendations
- Optimal control of production and remanufacturing in a simple recovery model with linear cost functions
- Lot-sizing for production planning in a recovery system with returns
- Optimal production planning for a multi-product closed loop system with uncertain demand and return
- Optimal lot sizing for a production-recovery system with time-varying demand over a finite planning horizon
- Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution
Cites Work
- Closed-Loop Supply Chain Models with Product Remanufacturing
- Reverse Channel Design: The Case of Competing Retailers
- Quantitative models for reverse logistics: A review
- Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution
- Inventory Control in Hybrid Systems with Remanufacturing
- Optimum Solution Structure for a Repairable Inventory Problem
- Optimal disposal policies for a single-item inventory system with returns
- An analysis of single item inventory systems with returns
- Simple optimal replenishment and disposal policies for a product recovery system with leadtimes
- Computational issues in a stochastic finite horizon one product recovery inventory model
- Title not available (Why is that?)
Cited In (11)
- Production planning in a three-stock reverse-logistics system with deteriorating items under a continuous review policy
- Optimal control of a production-inventory system with product returns and two disposal options
- On the optimal control of manufacturing and remanufacturing activities with a single shared server
- Management of returned products to a remanufacturing facility considering arrival uncertainty and priority processing
- Optimal control for advertised production planning in a three-level stock system with deteriorating items: case of a continuous-review policy
- Design of contract parameters in a closed-loop supply chain
- Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution
- Product Design Strategy with Commonality by Considering Customer-Choice Behavior in Supply Chain
- Optimal production decision with return collection uncertainty
- Title not available (Why is that?)
- Integrated recycling-integrated production-distribution planning for decentralized closed-loop supply chain
This page was built for publication: Optimal solution structure for multi-period production planning with returned products remanufacturing
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3069764)