An ARL-unbiased design of time-between-events control charts with runs rules
From MaRDI portal
Publication:3087818
DOI10.1080/00949650903520944zbMath1219.62185OpenAlexW2074422284MaRDI QIDQ3087818
Chuen-Sheng Cheng, Pei-Wen Chen
Publication date: 17 August 2011
Published in: Journal of Statistical Computation and Simulation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00949650903520944
Lua error in Module:PublicationMSCList at line 37: attempt to index local 'msc_result' (a nil value).
Related Items (17)
The efficiency of run rules schemes for the multivariate coefficient of variation: a Markov chain approach ⋮ On the performance of the adaptive EWMA chart for monitoring time between events ⋮ An ARL-unbiased \(np\)-chart ⋮ A new control chart using GINI CPK ⋮ Synthetic exponential control charts with unknown parameter ⋮ Shewhart-type monitoring schemes with supplementary w-of-w runs-rules to monitor the mean of autocorrelated samples ⋮ A EWMA control chart based on an auxiliary variable and repetitive sampling for monitoring process location ⋮ Simultaneously monitoring frequency and magnitude of events based on bivariate gamma distribution ⋮ Statistical design of ATS-unbiased charts with runs rules for monitoring exponential time between events ⋮ ARL-unbiased geometric andCCCGcontrol charts ⋮ Double moving average–EWMA control chart for exponentially distributed quality ⋮ Control charts for the Pareto distribution ⋮ On ARL-unbiased c-charts for INAR(1) Poisson counts ⋮ ARL-unbiased control charts for the monitoring of exponentially distributed characteristics based on type-II censored samples ⋮ A control chart using an auxiliary variable and repetitive sampling for monitoring process mean ⋮ Monitoring exponential data using two-sided control charts with runs rules ⋮ A distribution-free EWMA control chart for monitoring time-between-events-and-amplitude data
Cites Work
- Development of fuzzy process control charts and fuzzy unnatural pattern analyses
- A test for a change in a parameter occurring at an unknown point
- Counted Data CUSUM's
- Exact Results for Shewhart Control Charts with Supplementary Runs Rules
- A runs rule alternative to level crossings in statistical process control
- Cumulative quantity control charts for monitoring production processes
- An approach to the probability distribution of cusum run length
This page was built for publication: An ARL-unbiased design of time-between-events control charts with runs rules