Economic Lot-Sizing for Integrated Production and Transportation
From MaRDI portal
Publication:3100478
DOI10.1287/opre.1090.0727zbMath1226.90013OpenAlexW1995640674MaRDI QIDQ3100478
Publication date: 24 November 2011
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.1090.0727
Transportation, logistics and supply chain management (90B06) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (10)
Relaxations for two-level multi-item lot-sizing problems ⋮ Multiechelon Lot Sizing: New Complexities and Inequalities ⋮ Integrated production-delivery lot sizing model with limited production capacity and transportation cost considering overtime work and maintenance time ⋮ Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs ⋮ Production lot-sizing with dynamic capacity adjustment ⋮ A production-delivery lot sizing policy with stochastic delivery time and in consideration of transportation cost ⋮ Integrated product and packaging decisions with secondary packaging returns and protective packaging management ⋮ An integrated producer-buyer supply chain with delivery cost under stochastic transportation time ⋮ Polynomial cases of the economic lot sizing problem with cost discounts ⋮ Analysis of a dynamic lot-sizing problem with production capacity constraint
This page was built for publication: Economic Lot-Sizing for Integrated Production and Transportation