The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
DOI10.1007/S10951-014-0402-0zbMATH Open1347.90052OpenAlexW35584122MaRDI QIDQ310341FDOQ310341
Authors: T. Wauters, J. Kinable, Pieter Smet, Wim Vancroonenburg, Jannes Verstichel, Greet Vanden Berghe
Publication date: 8 September 2016
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-014-0402-0
Recommendations
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- New summary measures and datasets for the multi-project scheduling problem
- An improved ant algorithm for multi-mode resource constrained project scheduling problem
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Scheduling subject to resource constraints: Classification and complexity
- The third international timetabling competition
- Setting the research agenda in automated timetabling: the second international timetabling competition
- The first international nurse rostering competition 2010
- Justification and RCPSP: a technique that pays
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem
Cited In (15)
- Stochastic project scheduling with hierarchical alternatives
- A robust multi-project scheduling problem under a resource dedication-transfer policy
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
- A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem
- The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
- Strong bounds for resource constrained project scheduling: preprocessing and cutting planes
- Resource-constrained multi-project scheduling problem: a survey
- New summary measures and datasets for the multi-project scheduling problem
- Local search approaches for the test laboratory scheduling problem with variable task grouping
- A local search framework for industrial test laboratory scheduling
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem
This page was built for publication: The multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challenge
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q310341)