An algorithm with bounds for the proportional case of a two-machine problem in flow-shop scheduling theory with minimum delays
From MaRDI portal
Publication:3115649
zbMATH Open1249.90065MaRDI QIDQ3115649FDOQ3115649
Authors: Alexander Ageev
Publication date: 10 February 2012
Recommendations
- A 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum Delays
- Two-machine flow shop scheduling problems with minimal and maximal delays
- A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays
- SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
- scientific article; zbMATH DE number 900396
Cited In (6)
- The proportionate two-machine no-wait job shop scheduling problem
- Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance
- A branch and bound algorithm for the two-machine flowshop problem with unit-time operations and time delays
- A 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum Delays
- Two-machine flow shop scheduling problems with minimal and maximal delays
- Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines
This page was built for publication: An algorithm with bounds for the proportional case of a two-machine problem in flow-shop scheduling theory with minimum delays
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3115649)