Finding Optimal Material Release Times Using Simulation-Based Optimization
From MaRDI portal
Publication:3116626
DOI10.1287/mnsc.45.1.86zbMath1231.91275OpenAlexW2160055449MaRDI QIDQ3116626
Tito Homem-de-mello, Alexander Shapiro, Mark L. Spearman
Publication date: 12 February 2012
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/68830c24157028e2d07f0daf3902f8226bdc58dc
simulation-based optimizationtardinessstochastic systemsflow lineslead timesrelease strategiesmanufacturing executions
Production models (90B30) Production theory, theory of the firm (91B38) Consumer behavior, demand theory (91B42)
Related Items (9)
On sample size control in sample average approximations for solving smooth stochastic programs ⋮ A Simulation Optimization Approach for the Appointment Scheduling Problem with Decision-Dependent Uncertainties ⋮ An explicit analysis of the lead time syndrome: stability condition and performance evaluation ⋮ On Sampling Rates in Simulation-Based Recursions ⋮ Gradient-Based Adaptive Stochastic Search for Simulation Optimization Over Continuous Space ⋮ Production planning with load dependent lead times: An update of research ⋮ Aggregate order release planning for time-varying demand ⋮ Optimality functions in stochastic programming ⋮ An ordinal optimization based evolution strategy to schedule complex make-to-order products
This page was built for publication: Finding Optimal Material Release Times Using Simulation-Based Optimization