Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
From MaRDI portal
Publication:3116676
DOI10.1287/mnsc.45.6.889zbMath1231.90156MaRDI QIDQ3116676
Publication date: 12 February 2012
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/51fea4e868d48e5568197c33beb3fdee039a482c
90B35: Deterministic scheduling theory in operations research
90B30: Production models
90B05: Inventory, storage, reservoirs
91B32: Resource and cost allocation (including fair division, apportionment, etc.)
Related Items
Discrete-time, economic lot scheduling problem on multiple, non-identical production lines, Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines, Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing, Economic lot scheduling with resources in parallel, Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach