Resolving interferences of triple‐crossover‐cranes by determining paths in networks
From MaRDI portal
Publication:3120083
DOI10.1002/nav.21819zbMath1407.90141OpenAlexW2904363232WikidataQ128750501 ScholiaQ128750501MaRDI QIDQ3120083
Publication date: 1 March 2019
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.21819
Programming involving graphs or networks (90C35) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27)
Related Items (3)
Twin-crane scheduling during seaside workload peaks with a dedicated handshake area ⋮ Interference aware scheduling of triple-crossover-cranes ⋮ Routing two stacking cranes with predetermined container sequences
This page was built for publication: Resolving interferences of triple‐crossover‐cranes by determining paths in networks