scientific article; zbMATH DE number 6830851
From MaRDI portal
Publication:3131252
DOI10.13195/J.KZYJC.2016.0415zbMATH Open1389.90360MaRDI QIDQ3131252FDOQ3131252
Authors: Lei Wang, Lanshun Nie, Dechen Zhan, Bidou Wang, Gangyin Luo
Publication date: 29 January 2018
Title of this publication is not available (Why is that?)
Recommendations
- Two-phase heuristics for scheduling of multiple projects
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- An efficient multi-pass heuristic for project scheduling with constrained resources
- A multicriteria heuristic method to improve resource allocation in multiproject scheduling
- A heuristic search algorithm for solving resource-constrained project scheduling problems
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cited In (1)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3131252)