Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

Optimal algorithms for flow shop schedule with transporter

From MaRDI portal
Publication:3132230
Jump to:navigation, search

zbMATH Open1389.90116MaRDI QIDQ3132230FDOQ3132230


Authors: Yan Lan, Yinling Wang, He Guo Edit this on Wikidata


Publication date: 29 January 2018





Recommendations

  • AN IMPROVED APPROXIMATION ALGORITHM FOR THE TWO-MACHINE FLOW SHOP SCHEDULING PROBLEM WITH AN INTERSTAGE TRANSPORTER
  • Scheduling of a Two-machine Flowshop with Travel Time Between Machines
  • Flowshop problem \(F2 \to D|v=1\), \(c\geq 1|C_{\max}\) revisited
  • An improved two-machine flowshop scheduling with intermediate transportation
  • Flowshop scheduling with interstage job transportation


zbMATH Keywords

makespanflow shoptransporting time


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)



Cited In (5)

  • A note on the complexity of flow shop scheduling with transportation constraints
  • Title not available (Why is that?)
  • Transporting jobs through a processing center with two parallel machines
  • AN IMPROVED APPROXIMATION ALGORITHM FOR THE TWO-MACHINE FLOW SHOP SCHEDULING PROBLEM WITH AN INTERSTAGE TRANSPORTER
  • Title not available (Why is that?)





This page was built for publication: Optimal algorithms for flow shop schedule with transporter

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3132230)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3132230&oldid=16217587"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 3 February 2024, at 21:51. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki