Optimal algorithms for flow shop schedule with transporter
From MaRDI portal
Publication:3132230
zbMATH Open1389.90116MaRDI QIDQ3132230FDOQ3132230
Authors: Yan Lan, Yinling Wang, He Guo
Publication date: 29 January 2018
Recommendations
- AN IMPROVED APPROXIMATION ALGORITHM FOR THE TWO-MACHINE FLOW SHOP SCHEDULING PROBLEM WITH AN INTERSTAGE TRANSPORTER
- Scheduling of a Two-machine Flowshop with Travel Time Between Machines
- Flowshop problem \(F2 \to D|v=1\), \(c\geq 1|C_{\max}\) revisited
- An improved two-machine flowshop scheduling with intermediate transportation
- Flowshop scheduling with interstage job transportation
Cited In (5)
- A note on the complexity of flow shop scheduling with transportation constraints
- Title not available (Why is that?)
- Transporting jobs through a processing center with two parallel machines
- AN IMPROVED APPROXIMATION ALGORITHM FOR THE TWO-MACHINE FLOW SHOP SCHEDULING PROBLEM WITH AN INTERSTAGE TRANSPORTER
- Title not available (Why is that?)
This page was built for publication: Optimal algorithms for flow shop schedule with transporter
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3132230)