An effective heuristic for minimising makespan on unrelated parallel machines
From MaRDI portal
Publication:3157751
Recommendations
- Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem
- A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times
- A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search
- Heuristics for scheduling unrelated parallel machines
- scientific article; zbMATH DE number 605173
Cited in
(13)- A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times
- A comparative study of solution representations for the unrelated machines environment
- Makespan minimization for scheduling unrelated parallel machines: a recovering beam search approach
- scientific article; zbMATH DE number 605173 (Why is no real title available?)
- An efficient approximation algorithm for minimizing makespan on uniformly related machines.
- Iterated greedy local search methods for unrelated parallel machine scheduling
- Scheduling unrelated parallel machines with sequence-dependent setups
- Dispatching problems for parallel machines in the TFT‐LCD assembly process
- Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem
- Exact makespan minimization of unrelated parallel machines
- Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems
- Mixed integer programming model for scheduling in unrelated parallel processor system with priority consideration
- Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times
This page was built for publication: An effective heuristic for minimising makespan on unrelated parallel machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3157751)