Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis
From MaRDI portal
Publication:3163224
DOI10.1080/00207540902922869zbMath1197.90213OpenAlexW2148491213MaRDI QIDQ3163224
Hamid Davoudpour, H. R. Kia, Mostafa Zandieh
Publication date: 25 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540902922869
heuristicsschedulingsimulationsequence-dependent setup timesdynamic flexible flow lineregression meta-model
Related Items (2)
The third comprehensive survey on scheduling problems with setup times/costs ⋮ Dynamic routing strategies for JIT production in hybrid flow shops
Cites Work
- An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
- A survey of priority rule-based scheduling
- Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
- Scheduling a two-stage hybrid flowshop with separable setup and removal times
- Using real time information for effective dynamic scheduling
- A comparative study of dispatching rules in dynamic flowshops and jobshops
- Heuristics for scheduling in a flow shop with multiple processors
- Scheduling flexible flow lines with sequence-dependent setup times
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
- Two-Stage, Hybrid Flowshop Scheduling Problem
- A Survey of Scheduling Rules
- A computational study of heuristics for two-stage flexible flowshops
- Simple priority rule combinations: An approach to improve both flow time and tardiness
- Metamodels in manufacturing: a review
- Scheduling flexible flow lines with no in-process buffers
This page was built for publication: Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis