Switchgear component commonality design based on trade-off analysis among inventory level, delivery lead-time and product performance
From MaRDI portal
Publication:3163310
DOI10.1080/00207540902791868zbMath1197.90025OpenAlexW1983038504MaRDI QIDQ3163310
Shinji Nishiwaki, Yoshiya Ogihara, M. Yoshimura, Haruki Kariya, Shuichi Hayashi, Kazuhiro Izui
Publication date: 25 October 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540902791868
multiobjective optimisationinventory costtrade-off analysiscomponent commonalisationdelivery lead-time
Related Items
The component commonality problem in a real multidimensional space: an algorithmic approach ⋮ Buy online and pick up in-store: design of the service area
Cites Work
- Lead times, order release mechanisms, and customer service
- Dynamic Version of the Economic Lot Size Model
- Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems
- Multi-objective inventory control using electromagnetism-like meta-heuristic
- Determining Safety Stock in the Presence of Stochastic Lead Time and Demand
- Part family identification using a simple genetic algorithm
- Evaluation of product performance in product family design re-use
- Strategic inventory holding to allow the estimation of earlier due dates in make-to-order production
- Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain
- Lot sizing with bounded inventory and lost sales