A single-objective heuristic algorithm subject to a given upper bound of maximum tardiness
From MaRDI portal
Publication:3170916
Recommendations
- Efficient non-population-based algorithms for the permutation flowshop scheduling problem with makespan minimisation subject to a maximum tardiness
- Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness
- Minimizing total tardiness in permutation flowshops
- Metaheuristics for the permutation flowshop problem with a weighted quadratic tardiness objective
- A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
Cited in
(3)- Efficient non-population-based algorithms for the permutation flowshop scheduling problem with makespan minimisation subject to a maximum tardiness
- Metaheuristics for the permutation flowshop problem with a weighted quadratic tardiness objective
- A note on the equivalence of two heuristics to minimize total tardiness
This page was built for publication: A single-objective heuristic algorithm subject to a given upper bound of maximum tardiness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3170916)