Cost benefit analysis of a two duplicate unit parallel system with repair/replacement and correlated lifetimes of units
From MaRDI portal
Publication:3172741
Recommendations
- Cost-benefit analysis of a two-unit parallel system subject to degradation after repair
- scientific article; zbMATH DE number 889914
- A two-non-identical unit parallel/standby system model with single or double phase(s) of repair
- A two-non-identical-unit parallel system with correlated lifetimes
- Cost-benefit analysis of two-unit parallel system with administrative delay in repair
Cited in
(8)- scientific article; zbMATH DE number 227170 (Why is no real title available?)
- Cost benefit analysis of a complex system with inspection and two types of repair
- Cost-benefit analysis of a two-unit parallel system subject to degradation after repair
- Profit analysis of a three unit redundant system with correlated failure and repair times
- Cost-benefit analysis of two-unit parallel system with administrative delay in repair
- A discrete parametric Markov-chain model of two unit active redundant system with inspection and two types of repair
- Availability analysis of a complex system consisting of two subsystems in parallel configuration with replacement at failure
- Cost benefit analysis of 2-out of 3: \(G\) system with correlated failure and repair times
This page was built for publication: Cost benefit analysis of a two duplicate unit parallel system with repair/replacement and correlated lifetimes of units
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3172741)