Cost benefit analysis of a two duplicate unit parallel system with repair/replacement and correlated lifetimes of units
From MaRDI portal
Publication:3172741
zbMATH Open1247.90121MaRDI QIDQ3172741FDOQ3172741
Authors: Rakesh Gupta, Pradeep Sharma, Vishal Sharma
Publication date: 5 October 2011
Recommendations
- Cost-benefit analysis of a two-unit parallel system subject to degradation after repair
- scientific article; zbMATH DE number 889914
- A two-non-identical unit parallel/standby system model with single or double phase(s) of repair
- A two-non-identical-unit parallel system with correlated lifetimes
- Cost-benefit analysis of two-unit parallel system with administrative delay in repair
Reliability and life testing (62N05) Reliability, availability, maintenance, inspection in operations research (90B25) Applications of Markov renewal processes (reliability, queueing networks, etc.) (60K20)
Cited In (8)
- Cost benefit analysis of 2-out of 3: \(G\) system with correlated failure and repair times
- Profit analysis of a three unit redundant system with correlated failure and repair times
- Cost benefit analysis of a complex system with inspection and two types of repair
- Cost-benefit analysis of a two-unit parallel system subject to degradation after repair
- A discrete parametric Markov-chain model of two unit active redundant system with inspection and two types of repair
- Title not available (Why is that?)
- Cost-benefit analysis of two-unit parallel system with administrative delay in repair
- Availability analysis of a complex system consisting of two subsystems in parallel configuration with replacement at failure
This page was built for publication: Cost benefit analysis of a two duplicate unit parallel system with repair/replacement and correlated lifetimes of units
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3172741)