Multiobjective genetic algorithm to solve the train crew scheduling problem
From MaRDI portal
Publication:3178130
zbMATH Open1339.90141MaRDI QIDQ3178130FDOQ3178130
Authors: Ming-Shen Jian, Ta Yuan Chou
Publication date: 8 July 2016
Recommendations
- Solving a multi-objective interval crew-scheduling problem via genetic algorithms
- A Genetic Algorithm for Railway Scheduling Problems
- scientific article; zbMATH DE number 2087252
- Application of multiple-population genetic algorithm in optimizing the train-set circulation plan problem
- Railway crew scheduling: models, methods and applications
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cited In (5)
- A model and computational tool for crew scheduling in train transportation of mine materials by using a local search strategy
- A Genetic Algorithm for Railway Scheduling Problems
- Solving a multi-objective interval crew-scheduling problem via genetic algorithms
- Application of multiple-population genetic algorithm in optimizing the train-set circulation plan problem
- Operation simulation of urban rail train model based on multi-objective improved genetic algorithm
This page was built for publication: Multiobjective genetic algorithm to solve the train crew scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3178130)